Items where Division is "Teknik Mesin D3" and Year is 2024

Group by: Creators | Tipe Dokumen | No Grouping
Number of items: 107.

Thesis / Skripsi / Tugas Akhir

1902311072, Dwivant Nanda Eriana (2024) ANALISIS KINERJA EVAPORATOR PADA MESIN GENERATOR BUBUR ES. Lainnya thesis, Politeknik Negeri Jakarta.

1902311081, Furqon Miftakhul Huda (2024) PERHITUNGAN TEKNIS SISTEM PENGGERAK PADA MESIN CRUSHER BIJIH SILIKON DENGAN TENSILE STRENGTH 118 N per mm kuadrat. D3 thesis, Politeknik Negeri Jakarta.

1902311138, Muhamad Ridwan (2024) STUDI KASUS KERUSAKAN PADA CENTRE LATHE MACHINE MENGGUNAKAN METODE RCM DI PT.XX. Lainnya thesis, Politeknik Negeri Jakarta.

2002311076, Rais Muzhafar Hidayatullah (2024) PENYEBAB KERUSAKAN JUMPER PADA MESIN PORTABEL SPOT WELDING DI PT.X. D3 thesis, Politeknik Negeri Jakarta.

2002311084, Ahmad Dimassyach Ramadhan (2024) PERANCANGAN ALAT BANTU MESIN PACKAGING UNTUK MEMUDAHKAN PROSES PACKING DI PT.XYZ. D3 thesis, Politeknik Negeri Jakarta.

2002311088, Adhitya Dhany Prasetyo (2024) KAJIAN PENYEBAB KERUSAKAN CAPSTAN PADA MESIN TWISTING DI PT. INDOKORDSA. D3 thesis, Politeknik Negeri Jakarta.

2102311021, Raihan Almisky Pratama (2024) PERANCANGAN JIG AND FIXTURE ALAT BANTU MARKING FLANGE SIZE 2-1/16” to 3-1/16”. D3 thesis, Politeknik Negeri Jakarta.

2102311028, Andhika Syah Putra (2024) Studi Kasus Penyebab Penurunan Tekanan Pada Seal Air Fan 1B Di Diverter Damper Unit HRSG 1 PT. Krakatau Chandra Energi. D3 thesis, Politeknik Negeri Jakarta.

21023110296, Esahuda Rizqi Nugraha (2024) TROUBLESHOOTING KERUSAKAN PISTON SWASH PLATE PADA TRAVEL MOTOR EXCAVATOR LIUGONG 922E. D3 thesis, Politeknik Negeri Jakarta.

2102311042, Khilwan Fathoni (2024) STUDI KASUS KERUSAKAN NOSE LANDING GEAR SHOCK STRUT PADA PESAWAT BOEING-7XX DENGAN METODE ROOT CAUSE ANALYSIS (RCA) DI PT. XYZ. D3 thesis, Politeknik Negeri Jakarta.

2102311045, Bondan Hoirul Insan (2024) STUDI KASUS PENYEBAB KERUSAKAN FIN PADA RADIATOR SISTEM PENDINGIN MESIN DIESEL CAT-G3516 TA DI PT MEDCO ENERGI INTERNASIONAL TBK. D3 thesis, Politeknik Negeri Jakarta.

2102311077, Muhammad Ikhsan Harist (2024) KAJIAN MECHANICAL FAILURE PADA ELECTRICAL SUBMERSIBLE PUMP PERTAMINA HULU ROKAN DI LAPANGAN B PADA SUMUR D MELALUI PENDEKATAN DISMANTLE, INSPECTION, FAILURE, ANALYSIS (DIFA). D3 thesis, Politeknik Negeri Jakarta.

2102311080, Tsaqib Khiyarul Hasani (2024) Studi Kasus Penyebab Kerusakan Fuel Boost Pump Pada Pesawat Boeing 737-800. D3 thesis, Politeknik Negeri Jakarta.

2102311083, Falah Wahyu Ramadhan (2024) STUDI KASUS PENYEBAB ENGINE LOW POWER PADA UNIT EXCAVATOR LIUGONG 933E. D3 thesis, Politeknik Negeri Jakarta.

2102317001, Ahmad Syukron Najih (2024) Perancangan Dan Fabrikasi Alat Tambal Ban Yang Inovatif Pada Sepeda Motor. D3 thesis, Politeknik Negeri Jakarta.

2102317002, Raka Aditya Arief (2024) RANCANG BANGUN JIG VL UNTUK MEMBANTU PROSES MACHINING DIFFERENTIAL CASE. D3 thesis, Politeknik Negeri Jakarta.

2102317003, Rizky Fauza Nugraha (2024) Analisa Performance BLDC Motor Konversi Listrik Revo AT. D3 thesis, Politeknik Negeri Jakarta.

2102317004, Alessandre Hendrawan (2024) EFEKTIVITAS DAN EFISIENSI PUTARAN MOTOR PENGGERAK DC TERHADAP DONGKRAK ULIR 2000 KG. Lainnya thesis, Politeknik Negeri Jakarta.

2102317005, Muhammad Nugroho Naba Utomo (2024) Pengaruh Penggantian ECU Standar dengan ECU Programmable Multi Kurva terhadap Performa Efisiensi Pembakaran Motor CB150R Old. D3 thesis, Politeknik Negeri Jakarta.

2102317006, Kayla Luthfi Maulana Dika (2024) RANCANG BANGUN HYDROLIC BEARING TOOL (HBT) UNTUK PEMASANGAN DAN PELEPASAN BEARING 6205 32307 PADA KENDARAAN MOBIL KIJANG 7K. Lainnya thesis, Politeknik Negeri Jakarta.

2102317007, Riko Asmawi (2024) ANALISIS DESAIN VEHICLE POSITIONING JACK UNTUK MAINTENANCE MOBIL DI WORKSHOP. D3 thesis, Politeknik Negeri Jakarta.

2102317008, Ahmad Bahrul Ulum (2024) ANALISA KEKUATAN DUKUNG DAN PUNTIR PADA DESAIN POROS SERTA BEARING SEPEDA MOTOR: STUDI KASUS PADA KOMPONEN VELG DEPAN. Lainnya thesis, Politeknik Negeri Jakarta.

2102317010, Muhammad Ardiansyah Sugianto (2024) Pengaruh Modifikasi Disk Brake Terhadap Pelepasan Panas Pada Disk Brake Motor Vario CBS 125. D3 thesis, Politeknik Negeri Jakarta.

Abdul Azis, Daffa (2024) RANCANGAN MODIFIKASI SISTEM OTOMATIS POMPA SUBMERSIBLE DISTRIBUSI LIMBAH CAIR DI BANDAR UDARA INTERNASIONAL SOEKARNO-HATTA. D3 thesis, Politeknik Negeri Jakarta.

Laporan Kampus Merdeka

1902311072, Dwivant Nanda Eriana (2024) LAPORAN PRAKTIK KERJA LAPANGAN ANALISA PROSES 3D MODELING PIPING BERDASARKAN EQUIPMENT LAYOUT DAN PROCESS INSTRUMENTATION DIAGRAM PT X WILAYAH X PT PUSTEK E&T. [Laporan Kampus Merdeka]

2102311001, Nasiron (2024) TRIAL AND ERROR PADA PRODUK GARNISH ROOF SIDE INNER MENGGUNAKAN MESIN INJECTION MOLDING. [Laporan Kampus Merdeka]

2102311002, MUHAMAD AKBAR (2024) PERANCANGAN KERETA STORAGE SIDE-RAIL SEBAGAI SAFETY IMPROVEMENT DI LINE ASSY A. [Laporan Kampus Merdeka]

2102311004, Muhammad Iqbal (2024) PREVENTIVE MAINTENANCE PADA BOILER FEED PUMP UNIT HRSG 1 CCPP 120 MW PT. KRAKATAU CHANDRA ENERGI. [Laporan Kampus Merdeka]

2102311005, Rizkie Fauzan (2024) Laporan Praktik Kerja Lapangan Pengoperasian Sistem Transksi Di Gebang Tol Angke 1 Divisi Operasional PT JASAMARGA TOLLROAD OPERATOR. [Laporan Kampus Merdeka]

2102311006, Tri Fasil Muntazia (2024) PENGUKURAN EFECTIVITAS MESIN CNC LATHE DENGAN MENGGUNAKAN METODE OEE UNTUK PROSES PRODUKSI HOOK STRING DI PT. KAJI MACHINERY INDONESIA. [Laporan Kampus Merdeka]

2102311007, Abdul Faqih (2024) DEVELOP PACKAGING EKSPOR PT FUJI SEAT INDONESIA PT ADYAWINSA PLASTICS INDUSTRY. [Laporan Kampus Merdeka]

2102311008, Ichsan Pratama (2024) OPTIMASI PEMBUANGAN LIMBAH CLEANING STRAINER SEA WATER BOOSTER PUMP (SWBP) STEAM TURBINE DENGAN CARA MEMBUAT LUBANG DRAINASE DI PLTGU UBP PRIOK BLOK 4. [Laporan Kampus Merdeka] (Unpublished)

2102311011, Ayu Oktavianty Liswar (2024) Preventif Maintenance Pompa Kebakaran Jenis Diesel di PT. PLN Indonesia Power UBP Priok. [Laporan Kampus Merdeka]

2102311012, AFNAN RABBANI AL AMIN (2024) STUDY KASUS PENYEBAB KEGAGALAN PROSES RIFETING CROSSMEMBER PADA LINE SUB ASSY. [Laporan Kampus Merdeka]

2102311015, Muhammad Kurnia Chaisar (2024) DAILY CHECK MAINTENANCE MESIN STAMPING DI PT RACHMAT PERDANA ADHIMETAL. [Laporan Kampus Merdeka]

2102311018, Muhammad Qausyar (2024) EVALUASI KUALITAS PRODUK SEAT WATER PUMP PULLEY DALAM IMPLEMENTASI DIVISI QUALITY CONTROL PT. KAJI MACHINERY INDONESIA. [Laporan Kampus Merdeka] (Submitted)

2102311023, Muhamad Yusuf (2024) IMPLEMENTASI MAINTENANCE REPLACEMENT RUBBER BELT MESIN THUMBLASTER TC-312 DI PT XYZ. [Laporan Kampus Merdeka] (Unpublished)

2102311026, Rashiqa Safa Mariam Faadhillah (2024) ANALISIS PERHITUNGAN LIFETIME BEARING PADA MESIN DOUBLE MOULD CENTRIFUGAL CASTING DI PT EBARA INDONESIA. [Laporan Kampus Merdeka]

2102311027, Muhammad Ilham Habibie (2024) LAPORAN PRAKTEK KERJA LAPANGAN PREVENTIVE MAINTENANCE CONDENSATE EXTRACTION PUMP DI AREA STG DI PT. KRAKATAU CHANDRA ENERGI. [Laporan Kampus Merdeka] (Unpublished)

2102311028, Andhika Syah Putra (2024) LAPORAN PRAKTIK KERJA LAPANGAN PREVENTIVE MAINTENANCE SEAL AIR FAN 1B PADA UNIT HRSG 1 DI PT. KRAKATAU CHANDRA ENERGI. [Laporan Kampus Merdeka]

2102311030, NATANAEL PURBA (2024) PREVENTIVE MAINTENANCE PADA GAS TURBINE CLOSED COOLING WATER HEAT EXCHANGER (FAN) BLOK 4 UBP PRIOK. [Laporan Kampus Merdeka]

2102311034, Evan Rabbani Ashidieqi (2024) PROSES ASSEMBLY UNIT HM400-3R DI PT. KOMATSU INDONESIA. [Laporan Kampus Merdeka]

2102311035, Ramdani Abdillah (2024) TATA CARA MELAKUKAN PEMELIHARAAN ATAU PREVENTIVE MAINTENANCE 250 HOURS PADA UNIT WHEEL LOADER CLG856H. [Laporan Kampus Merdeka]

2102311036, Naufal Khiyarulloh (2024) LAPORAN PRAKTIK KERJA LAPANGAN REPLACEMENT MAIN LANDING GEAR WHEEL PADA BOEING 737-800 NG DI PT GMF AEROASIA TBK. [Laporan Kampus Merdeka]

2102311039, RIO SEPTIANI (2024) PERANCANGAN CONVEYOR MOTOR ROLLER SEBAGAI PENAMBAHAN EQUIPMENT DI PLANT CIKAMPEK SETELAH PEMINDAHAN MESIN STAMPING 300T DAN 400T. [Laporan Kampus Merdeka]

2102311041, Diyas Anggito Wicaksono (2024) LAPORAN PRAKTIK KERJA LAPANGAN REDRAWING OIL COOLER (CRANE COBELCO 5045) DI PT. AIR SURYA RADIATOR. [Laporan Kampus Merdeka]

2102311042, Khilwan Fathoni (2024) LAPORAN PRAKTIK KERJA LAPANGAN PERAWATAN NOSE LANDING GEAR SHOCK STRUT PADA PESAWAT B-777-300ER PT. GMF AEROASIA TBK. [Laporan Kampus Merdeka]

2102311045, Bondan Hoirul Insan (2024) LAPORAN PRAKTIK KERJA LAPANGAN PROSES PENGECATAN PADA RADIATOR CAT-G3512 PENDINGIN MESIN DIESEL DI PT. AIR SURYA RADIATOR. [Laporan Kampus Merdeka]

2102311048, Muhammad Rizki Rifaldy Sofyan (2024) PROSES PRODUKSI OIL COOLER DI PT. SAEIKI TANGGUH COOLER. [Laporan Kampus Merdeka]

2102311052, Ridha Putra Ryandra (2024) Laporan On the Job Training Proses Produksi Komponen Core Untuk Radiator di PT. Air Surya Radiator. [Laporan Kampus Merdeka]

2102311053, Baihaqi Zaki Sulaiman (2024) PROSES QUALITY CONTROL FLANGE LB 1 DI PT FAHMI CIPTA ABADI. [Laporan Kampus Merdeka]

2102311056, RIDHO SEPTIAN SITUNGKIR (2024) IMPROVEMENT MESIN POTONG PIPA KERAMIK DI PT TEMPSENS ASIA JAYA. [Laporan Kampus Merdeka]

2102311058, Rayhan Rizki Ramadan (2024) PEMBUATAN DOKUMEN WELDING PROCEDURE UNTUK UNDERFRAME PADA KOMPONEN ANTI CLIMBER 1 PROYEK KRL-KCI PT. INKA (PERSERO). [Laporan Kampus Merdeka]

2102311059, Fahrul Erizal (2024) PROSES PENGGANTIAN LH LONGITUDINAL TANK 246 LITER PADA HELICOPTER SUPER PUMA AS332 L2. [Laporan Kampus Merdeka]

2102311061, Muhammad Fauzan Tijani (2024) PENGAMATAN DIMENSI DAN GEOMETRI PADA PROSES FABRIKASI UNDERFRAME TIPE-M PADA PROYEK KRL KCI PADA PT. INKA (PERSERO). [Laporan Kampus Merdeka]

2102311062, Barkah Putra Purwanto (2024) PROSES PENGGANTIAN TAIL ROTOR BLADES PADA HELIKOPTER SUPER PUMA AS332 L2. [Laporan Kampus Merdeka]

2102311063, Ahmad Rizki Lukita (2024) Proses Manufacturing Drawing Part Bolster TP-612. [Laporan Kampus Merdeka]

2102311064, Muhammad Farhan Fadillah (2024) ASSEMBLE DAN DISASSEMBLE DIRETCIONAL CONTROL VALVE WHEEL LOADER CLG856H. [Laporan Kampus Merdeka]

2102311065, Ahmad Diartama Perisha Terok (2024) PENGECATAN BUFFER LOKOMOTIF UNTUK PERSIAPAN MUDIK LEBARAN 2024 DI DEPO LOKOMOTIF BESAR A CIPINANG. [Laporan Kampus Merdeka] (Submitted)

2102311066, Yehezkiel Immanuel Veroti (2024) ANALISA PENGARUH VISKOSITAS COOLANT DENGAN NILAI KONSENTRASI 4%, 5%, DAN 6% TERHADAP TEMPERATURE MATA POTONG TWIST DRILL Ø6,5. [Laporan Kampus Merdeka]

2102311067, Agizar Filzah Pahlevi (2024) Perawatan & perbaikan P 24 Bogie TB 1014. [Laporan Kampus Merdeka]

2102311069, Muhammad Syafwan Fikri Yanuar (2024) PENGARUH VISKOSITAS COOLANT DENGAN NILAI KONSENTRASI 6%, 7%, dan 8% TERHADAP KEAUSAN MATA POTONG TWIST DRILL Ø8,5. [Laporan Kampus Merdeka]

2102311072, Pry Anggana Ramadhan (2024) PEMBUATAN DUDUKAN PNEUMATIK PADA MESIN SPRUE CUTTING DEPARTEMEN MAINTENANCE DIVISI WORKSHOP DI PT. FEDERAL IZUMI MANUFACTURING. [Laporan Kampus Merdeka]

2102311073, Muhamad Nur Fazrian (2024) PERAWATAN BERKALA ENGINE FILTER PADA LOKOMOTIF DI PT KAI. [Laporan Kampus Merdeka]

2102311074, Devanzah Khairan Athallah (2024) REMOVE AND INSTALL SEAL PADA TRAVEL MOTOR EXCAVATOR 922E DARI ANALISA LEAKAGE PADA TRAVEL MOTOR PT LIUGONG MACHINERY. [Laporan Kampus Merdeka]

2102311075, Gilang Yuliyanto (2024) ANALISIS IMPROVEMENT CONVEYOR PADA AIR CLEANER PRODUCTION LINE DI PT. TOYOTA BOSHOKU INDONESIA. [Laporan Kampus Merdeka]

2102311076, Almer Azizi Hanif (2024) PROSEDUR BITE TEST UNTUK MENGIDENTIFIKASI FAULT PADA THRUST REVERSER DI PESAWATBOEING 737-800 DI PT GMF AEROASIA TBK. [Laporan Kampus Merdeka]

2102311077, Muhammad Ikhsan Harist (2024) Laporan Kerja Praktik Lapangan Studi Kasus Kerusakan Electrical Submersible Pump Pertamina Hulu Rokan Pada Lapangan B Di Sumur D. [Laporan Kampus Merdeka]

2102311078, Hasjim Win (2024) PROSES PEMBUATAN MANUFACTURING DRAWING CENTRIFUGAL BRACKET PT. INKA. [Laporan Kampus Merdeka]

2102311079, Rafis Ardiansyah (2024) PEMBUATAN WELDING PROCEDURE PADA BAGIAN BOGIE PART GEAR BOX SUPPORT UNTUK PROYEK KRL KCI PT INDUSTRI KERETA API (PERSERO). [Laporan Kampus Merdeka]

2102311080, Tsaqib Khiyarul Hasani (2024) REPLACEMENT TANK 1 AFT BOOST PUMP LOW PRESS PADA PESAWAT BOEING 737-800 DI PT GMF AEROASIA TBK. [Laporan Kampus Merdeka]

2102311083, FALAH WAHYU RAMADHAN (2024) DISASSEMBLY & ASSEMBLY SEAL PADA STEERING CYLINDER UNIT WHEEL LOADER 856H. [Laporan Kampus Merdeka]

2102311084, Daniel Taurus Marbun (2024) PERSIAPAN DAN PERAWATAN JIG PADA PROSES GANTI MODEL DI PT. FEDERAL IZUMI MANUFACTURING. [Laporan Kampus Merdeka]

2102311088, Rifky Aditya Wahyu (2024) LAPORAN ON JOB TRAINING PENGUKURAN DIMENSI GEOMETRIS CUTTING TOOL UNTUK PROSES MACHINING DI PT. FEDERAL IZUMI MANUFACTURING. [Laporan Kampus Merdeka]

2102311089, Muhammad Rafif Athallah (2024) PROSES PEMBUATAN DISC BRAKE MMKI DI PT. BRAJA MUKTI CAKRA. [Laporan Kampus Merdeka]

2102311090, Wildan Rizki Maulana (2024) ANALISA PERAWATAN BOGIE TIPE TB 1014 (K10). [Laporan Kampus Merdeka]

2102311091, Irsal Selamet Dirsa (2024) PROSES TAPPING PADA MESIN FANUC ROBO DRILL UNTUK FABRIKASI ROD CONNECTING PT. HAMATETSU INDONESIA. [Laporan Kampus Merdeka]

2102311097, Choirul Akbar Nur Prasetyo (2024) PROSES MACHINING PADA MESIN NC LATHE UNTUK FABRIKASI ROD CONNECTING PT. HAMATETSU INDONESIA. [Laporan Kampus Merdeka]

2102311098, Muhammad Irgi (2024) PENERAPAN PLANNED MAINTENANCE QY378 SHOT BLASTING MACHINE DI FOUNDRY PLANT PT DURAQUIPT CEMERLANG. [Laporan Kampus Merdeka]

2102311099, Dzaki Luthfi Putra (2024) PEMELIHARAAN 3 TAHUNAN (OVERHAUL) TRAINSET 3 AUTOMATED PEOPLE MOVER SYSTEM (APMS) BANDARA SOEKARNO HATTA. [Laporan Kampus Merdeka]

2102311100, Muhammad Al Arya Nugroho (2024) LAPORAN ON JOB TRAINING PEMBUATAN AS HIDROLIK MOULD MAJU MUNDUR HARCHROME SC 45 DIVISI MAINTENANCE. [Laporan Kampus Merdeka]

2102311103, Dimas Karami (2024) PENERAPAN QUALITY MAINTENANCE PADA MESIN PEDESTAL MIXER OMEGA 305p. [Laporan Kampus Merdeka]

2102311105, Bariqulnajmi Al Fattah (2024) PERAWATAN KENDARAAN PENGHILANG KARET LANDASAN BANDARA INTERNASIONAL SOEKARNO - HATTA. [Laporan Kampus Merdeka]

2102311106, Muhammad Rafli Akbar (2024) LAPORAN PRAKTIK KERJA LAPANGAN PREVENTIVE MAINTENANCE PADA MESIN SHEARING PLATE DI BAGIAN WORKSHOP. [Laporan Kampus Merdeka]

2102311108, Marva Sepiyan (2024) PREVENTIVE MAINTENANCE MESIN BANDSAW DI BAGIAN WORKSHOP. [Laporan Kampus Merdeka] (Submitted)

2102311109, Supriyanto (2024) DESAIN REKONDISI PLANT 2 PADA NEW ROOM PANEL SAND PLANT TURO MIXER DI PT. BAKRIE AUTOPARTS. [Laporan Kampus Merdeka]

2102311110, Bagus Ardianto (2024) DESAIN FUEL HANDLING SYSTEM BAGIAN CHARGING PeLUIt-40. [Laporan Kampus Merdeka]

2102311119, ILHAM FAJRIN ALKHATAMI (2024) PROSES REPAIR UNTUK BUSHING HOUSING DRIVE KEY TENON DI INBOARD WHEEL HALF PESAWAT BOEING 737-800. [Laporan Kampus Merdeka]

2102311120, Muhammad (2024) STUDI KEBUTUHAN LUAS AREA PENYIMPANAN SEMENTARA PADA AREA INCOMING PT AUTOPLASTIK INDONESIA. [Laporan Kampus Merdeka]

2102311174, Rama Bagas Aditya (2024) STUDI KASUS KEGAGALAN STARTER PADA LIUGONG EXCAVATOR 9035E YANG DIAKIBATKAN OLEH KERUSAKAN FUSE DAN RELAY. [Laporan Kampus Merdeka]

2102318001, Ajib Khamdam (2024) Pemeliharaan Mesin Stamping Yushida 160 Ton (Tipe C). [Laporan Kampus Merdeka]

2102318003, Muhammad Tegar Nurhadi (2024) ANALISA PERPIPAAN GAS LNG AREA PRODUKSI DRYING DI PT. GS BATTERY Plant Karawang. [Laporan Kampus Merdeka]

2102318004, Farrel Habibie Aned (2024) LAPORAN PRAKTIK KERJA INDUSTRI FABRIKASI PEMBUATAN PRESSURE PART UNIT BOILER. [Laporan Kampus Merdeka]

Alifah, Safa (2024) ANALISIS SIMULASI DISTRIBUSI HELIUM DI DALAM STEAM GENERATOR HTGR 40 MWt. [Laporan Kampus Merdeka]

Ananda, Noufal Nafirah (2024) Preventive Maintenance Ram Air Turbine Pada Boeing 777-300er Di PT GMF Aeroasia TBK. [Laporan Kampus Merdeka] (Unpublished)

Anandika, Azriel (2024) MODIFIKASI MESIN AUTO COS (CAST-ON-STARP). [Laporan Kampus Merdeka]

Darmawan, Muhammad Dito (2024) LAPORAN PRAKTIK KERJA LAPANGAN WAREHOUSEMAN PADA DEPARTEMEN PART OPERATION & DISTRIBUTION DI PT TRAKINDO UTAMA KANTOR CABANG BSD. [Laporan Kampus Merdeka]

Ferdian, Michael (2024) Laporan Praktik Kerja Lapangan Monitoring Kendaraan Maung untuk Kementrian Pertahanan PT Pindad. [Laporan Kampus Merdeka]

IZZATUL AISY, RAFI (2024) REDESIGN SISTEM TRANSMISI DALAM UPAYA MENINGKATKAN EFISIENSI MEKANIS SPIRAL STEEL BAR BENDING. [Laporan Kampus Merdeka]

Jayadi, Asyhar (2024) LAPORAN ON THE JOB TRAINING MAINTENANCE INTERVAL SCHEDULE 100 HOURS PADA UNIT LIUGONG WHEEL LOADER 856H. [Laporan Kampus Merdeka]

Maulana, Faizal Fajar (2024) LAPORAN ON JOB TRAINING DEPARTEMEN ENGINEERING DIVISI DRAFTER 2D PT. AIR SURYA RADIATOR. [Laporan Kampus Merdeka]

Muhtadi, Sabilal (2024) DISMANTLE, INSPECTION, AND FAILURE ANALYSIS (DIFA) KOMPONEN ELECTRICAL SUBMERSIBLE PUMP (ESP) DI SUMUR PRODUKSI LMP-48. [Laporan Kampus Merdeka]

Muhtadi, Sabilal (2024) LAPORAN PRAKTIK KERJA LAPANGAN DISMANTLE, INSPECTION, AND FAILURE ANALYSIS (DIFA) KOMPONEN ELECTRICAL SUBMERSIBLE PUMP (ESP) DI SUMUR PRODUKSI LMP48. [Laporan Kampus Merdeka]

Nugraha, Esahuda (2024) ASSEMBLE DAN DISASSEMBLE TRAVEL MOTOR EXCAVATOR 922E LIUGONG. [Laporan Kampus Merdeka] (Submitted)

Raihan Almisky Pratama, 2102311021 (2024) PROSES PENGUJIAN HYDROTEST PADA X-MASS TREE DI PT. REVOLUTEK DANAJAYA MANDIRI. [Laporan Kampus Merdeka]

VALENTINO, RAHMAN (2024) PROSES PENGGANTIAN FORWARD TRANSFER FUEL TANK 405 LITER PADA HELICOPTER SUPER PUMA AS332 L2. [Laporan Kampus Merdeka]

rahman, fazlur (2024) PROSES PRESSURE TEST TUBING HANGER PT REVOLUTEK DANANJAYA MANDIRI. [Laporan Kampus Merdeka]

This list was generated on Fri Sep 20 00:25:02 2024 WIB.