
Items where Division is "Teknologi Rekayasa Konversi Energi D4" and Year is 2025
2
2102321006, Adam Hidayat (2025) PENYEBAB DAN MITIGASI INSIDEN THERMAL RUNAWAY PADA BATERAI PACK. [Laporan Kampus Merdeka]
2102321008, Mohamad Bagas Aditya (2025) ANALISIS EFISIENSI DAN KARAKTERISTIK TEKNIS SISTEM HYBRID SOLAR PHOTOVOLTAIC PADA BATTERY SWAP STATION (BSS) DI BBSP KEBTKE. [Laporan Kampus Merdeka]
2102321012, Adila Syifa Prayogi (2025) ANALISIS DAN PEMBUATAN DESAIN PLTS ATAP RESIDENSIAL 2-15 KWP DENGAN PERANGKAT LUNAK HELIOSCOPE. [Laporan Kampus Merdeka]
2102321014, Ray Suryo Wicaksono (2025) PENGOPERASIAN DESALINATION PLANT UNTUK MENGHASILKAN RAW WATER PADA PLTGU CILEGON. [Laporan Kampus Merdeka]
2102321016, Moh Fardhan Rinaldi (2025) ANALISIS GAIN OUTPUT RATIO DESAL 1A DENGAN GAIN OUTPUT RATIO DESAL 1B PADA LOADSET 90% DI PT. PLN INDONESIA POWER UBP CILEGON. [Laporan Kampus Merdeka]
2102321019, Bagus Handriyani (2025) ANALISA EFISIENSI GAS AIR HEATER PADA PLTU CIREBON UNIT 1 SEBELUM DAN SESUDAH MAJOR OVERHAUL 2024. [Laporan Kampus Merdeka]
2102321023, In In Mustopa (2025) PERBANDINGAN METODE ALIRAN ENERGI DAN ISENTROPIK UNTUK ANALISIS ENERGI TURBIN UAP TEKANAN TINGGI DI PT PLN INDONESIA POWER UBP CILEGON. [Laporan Kampus Merdeka]
2102321029, Vira Eka Safitri (2025) UPGRADE MODIFIKASI SISTEM PLANT MONITORING MENGGUNAKAN SCADA HAIWELL CLOUDBOX BERBASIS IOT DI SITE BATAMINDO. [Laporan Kampus Merdeka]
2102321052, Alita Syahrani (2025) ANALISIS KINERJA PLTS SISTEM HYBRID UNTUK STASIUN PENUKARAN BATERAI KENDARAAN LISTRIK UMUM (SPBKLU) DALAM PROJECT ENTREV DI BBSP KEBTKE LEMIGAS KESDM. [Laporan Kampus Merdeka]
2102322001, Mohammad Yazdi Rachim (2025) Metode Sampling Fondasi Equipment Stationary Equipment untuk Kebutuhan Asesmen pada Reaktivasi Train F PT Badak NGL. [Laporan Kampus Merdeka]
2102322002, Rosyida Mufarihah Fauziyah (2025) ASSESSMENT MEDIUM VOLTAGE MOTOR 32-GM-14 COOLING WATER PUMP PT BADAK NGL. [Laporan Kampus Merdeka]
2102322002, Rosyida Mufarihah Fauziyah (2025) EVALUASI PERALATAN LISTRIK AREA UTILITIES DAN STORAGE & LOADING UNTUK PROGRAM REAKTIVASI TRAIN F PT BADAK NGL. [Laporan Kampus Merdeka]
2102322004, Dzikri Firman Syarif (2025) 31-PG-4 ROTOR RECONDITION ASSESSMENT FOR TRAIN F REACTIVATION. [Laporan Kampus Merdeka]
2102322004, Dzikri Firman Syarif (2025) EVALUASI PERSIAPAN PERALATAN ELECTRICAL PADA TAHAPAN PRELIMINARY ASSESSMENT UNTUK REAKTIVASI TRAIN F. [Laporan Kampus Merdeka]
2102322005, Zakiy Dwiyan Kartiko (2025) IDENTIFIKASI PENENTUAN CONDITION MONITORING LOCATION INSPEKSI PIPA F1P17–20”–FG2D PT BADAK NGL. [Laporan Kampus Merdeka]
2102322006, Muhammad Raihan Alfirdaus (2025) Identifikasi Pre-Assessment Rotating Equipment Prior Reactivation In Badak LNG. [Laporan Kampus Merdeka]
2102322006, Muhammad Raihan Alfirdaus (2025) Penerapan Metode FMEA dalam Penentuan Urutan Prioritas Pengadaan Spare Part Steam Turbine untuk Reaktivasi Train F Badak LNG. [Laporan Kampus Merdeka]
2102322007, Herianto Ramadan (2025) OPTIMASI NILAI EFISIENSI OPERASIONAL INTERNAL STEAM TURBINE GENERATOR (BACK PRESSURE) UTILITIES-II PT BADAK NGL DENGAN MENAIKKAN ENTALPI STEAM MELALUI SIMULASI SOFTWARE TERMODINAMIKA. [Laporan Kampus Merdeka]
2102322008, Farhan Daffa Pratama (2025) PEMUTAKHIRAN DATASHEET DISPLACEMENT LEVEL TRANSMITTER UNTUK REPLACEMENT DALAM PERSIAPAN ASSESSMENT REAKTIVASI TRAIN F DI PT BADAK NGL. [Laporan Kampus Merdeka]
2102322008, Farhan Daffa Pratama (2025) SIZING BODY CONTROL VALVE 36-KV-32A/B UTILITIES I UNTUK PROYEK REAKTIVASI PT BADAK NGL. [Laporan Kampus Merdeka]
2102322009, Nathaya Az'zahraufa Madina (2025) ANALISIS GANGGUAN OPERASIONAL CHILLER DAN IMPLEMENTASI DESAIN CHILLER BARU PADA PLANT 29 TR. A UTILITIES I DALAM PROYEK REAKTIVASI PT BADAK NGL. [Laporan Kampus Merdeka]
2102322012, Iqbal Fauzan (2025) ANALISIS KEBUTUHAN WATER TREATMENT PLANT (PLANT-36) DALAM MENDUKUNG OPERASI 4 TRAIN PASCA REAKTIVASI TRAIN F DI PT BADAK NGL. [Laporan Kampus Merdeka]
2102322014, Kirana Syafa Maharani (2025) Evaluasi Penggantian Spare Part Turbin Uap F4-KT-1/2/3 saat Overhaul untuk Reaktivasi Train F di PT Badak NGL. [Laporan Kampus Merdeka]
2102322016, Muhammad Maulidan Azazi Manah Fitroh (2025) PEMBUATAN DATASHEET VALVE PADA TRAIN F PT BADAK NGL. [Laporan Kampus Merdeka]
2102322018, Bintang Ade Putra (2025) ANALISIS PEMANFAATAN LINE INTERCONNECTING LPG BOTTLE UNTUK TRANSFER PROPANE LIQUID DARI SISTEM PROPANE BULLET KE PROCESS TRAIN DI KILANG BADAK LNG. [Laporan Kampus Merdeka]
2102322019, Restu Rahayu Prihantini (2025) ANALISIS HASIL LAPORAN INSPEKSI DAN REASSESSMENT DATA RISK BASED INSPECTION (RBI) PIPA TRAIN H PT BADAK NGL TAHUN 2021-2024. [Laporan Kampus Merdeka]
A
Airlangga Sakti, Bintang and Nuryanto, Fani and Krisna, Krisna and Nur Fauzi, Muhammad (2025) PERANCANGAN PLTS ATAP OFF GRID UNTUK RUMAH HIJAU LOBADAUN. D4 thesis, Politeknik Negeri Jakarta.
Amarullah Ramadhan, 2102321032 (2025) LAPORAN PRAKTIK KERJA LAPANGAN PERENCANAAN SISTEM PLTS ATAP ON-GRID KAPASITAS 327 KWP MENGGUNAKAN SOFTWARE ETAP 19.0.1 DI PT KOTA JATI FURINDO. [Laporan Kampus Merdeka] (Unpublished)
Andika Maulana Yunus, 2102321007 (2025) Analisis Performa & Efisiensi Produktivitas Pada Mesin Es Kristal Tube Dengan Kapasitas 10 Ton Menggunakan Refrigeran R404A di PT Pandu Mahardika Perdana Technician Support. [Laporan Kampus Merdeka]
C
Can, Ahlul Haq (2025) PERAWATAN HOIST CRANE DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) UNTUK MENGURANGI BREAKDOWN DI PT. DEXIN STEEL INDONESIA (DSI) KAWASAN PT. IMIP. [Laporan Kampus Merdeka]
K
Kartiko, Zakiy Dwiyan (2025) ANALISIS PRIORITAS ASSESSMENT PIPA REAKTIVASI TRAIN F PT BADAK NGL DENGAN METODE MULTI CRITERIA DECISION MAKING (MCDM). [Laporan Kampus Merdeka]
M
Maulana Yunus, Andika (2025) Analisis Performa & Efisiensi Produktivitas Pada Mesin Es Kristal Tube Dengan Kapasitas 10 Ton Menggunakan Refrigeran R404A di PT Pandu Mahardika Perdana Technician Support. [Laporan Kampus Merdeka]