2002411058, Rizqi Aqdam Erlangga (2024) OPTIMASI PROSES ASSEMBLY DALAM MENINGKATKAN EFISIENSI PRODUKSI MESIN. [Laporan Kampus Merdeka]
LAPORAN OJT_RIZQI AQDAM ERLANGGA.pdf
Restricted to Hanya Civitas Akademika PNJ
Download (4MB)
| Tipe Dokumen: | Laporan Kampus Merdeka |
|---|---|
| Subjek: | 600 – Teknologi (Ilmu Terapan) > 670 Manufaktur, pabrik-pabrik > 670 Manufaktur, pabrik-pabrik |
| Bidang, Unit, atau Jurusan Yang Ditujukan: | Teknik Mesin > Manufaktur D4 |
| User ID Pengunggah: | Rizqi Aqdam Erlangga |
| Date Deposited: | 16 Aug 2024 09:00 |
| Last Modified: | 16 Aug 2024 09:00 |
| URI: | https://repository.pnj.ac.id/id/eprint/18773 |

